Pabrik Tekstil Karawang
Karawang · 2025
1.9 MWp
Jakarta, DKI Jakarta4.9(32 reviews)Established in 2015
EPC PLTS skala industri untuk pabrik & gudang. Pengerjaan O&M jangka panjang dan opsi skema BOO (Build-Own-Operate) dengan PPA hingga 15 tahun tanpa CapEx pelanggan.
Below are 3 featured projects out of 47+ projects that have been completed.
Karawang · 2025
1.9 MWp
Bekasi · 2024
980 kWp
Tangerang · 2024
2.4 MWp
SLO PLN
Operation Worthiness Certificate (SLO) from PLN — mandatory for on-grid rooftop solar
SBU
Business Entity Certificate (SBU) from the Ministry of Public Works / Energy
ISO 9001
ISO 9001:2015 Quality Management System
AESI
Member of the Indonesian Solar Energy Association (AESI)