Villa Off-Grid Nusa Penida
Klungkung, Bali · 2025
28 kWp
Denpasar, Bali4.9(56 reviews)Established in 2016
PLTS off-grid untuk villa, resort, dan fasilitas remote di Bali, Lombok, dan kepulauan Nusa Tenggara. Sistem hybrid dengan baterai LFP dan backup generator otomatis.
Below are 3 featured projects out of 73+ projects that have been completed.
Klungkung, Bali · 2025
28 kWp
Lombok Utara · 2024
65 kWp
Gianyar · 2024
18 kWp
SLO PLN
Operation Worthiness Certificate (SLO) from PLN — mandatory for on-grid rooftop solar
AESI
Member of the Indonesian Solar Energy Association (AESI)